Brewery Build Update Mid March 18

So I was thinking I would have plenty of time to write a short update here and there over the last 6 weeks....  Well this is the second instalment.  Big stuff we have done since the first post. Added new drainage and filtration, and water feed pipe in,  doors, heating, insulation, electrical cabling, and now to look after the beer in the best possible way after bottling a cold room.  Now I am not standing in muddy trenches or crawling through roof spaces I can soon concentrate on brewing beer again.  All this as been done with snow, some days at -9, really great job from our local contractors.  A few details remain and a good clean up and we are ready to go ! 